Post-Hurricane Melissa restoration and improvement works have been completed at Nazareth Primary and Infant School in Manchester and Marcus Garvey Technical High School in St. Ann.

This is according to the National Education Trust, NET, the agency mandated to coordinate rehabilitation efforts of schools damaged during the passage of the hurricane.

At Nazareth, which has a population of 126 students, the intervention included the rehabilitation of roofing, classrooms, offices, agricultural facilities, learning spaces and a school museum.

NET says work was also done to shore up vulnerable sections of the infrastructure against future weather events.

Meanwhile, at Marcus Garvey High, extensive restoration works were undertaken across the Agricultural and Industrial Arts departments.

NET says this included the renovation of classrooms, offices, the greenhouse, laboratories and other practical learning spaces.

The agency says the improvements have allowed students and teachers to return to their regular learning spaces and resume resume hands-on training and crop production.

Melissa caused damage to 688 public schools across the country.

Last week, the government reported that 63 of the 306 classified as priority one in terms of the scale of damage, have been repaired. Works are underway at another 81.

Of those with moderate damage, classified as priority two, six of the 100 have so far been repaired.

And of the 119 priority three schools, which suffered minor damage, only one has since been repaired.